Board Meeting – April 23, 2025 – 4:00pm
Call In: 1(773) 917-3399
Passcode: 332 953 368#
Project highlights include a new 18-inch landfill gas main header from Cell 7A to Cell 6B. Along with the header, will be a new toe drain. A Wind Defender will be added on top of the existing rain cover on Cell 6B and Cell 4. This will help to protect and secure the existing rain cover.