Special Board Meeting – November 20, 2024 – 3:30pm
Board Meeting – November 20, 2024 – 4:00pm
This project included the renovation of 7,227 SF of existing space within the education wing of the Frank Guaracini, Jr. Fine and Performing Arts Center to convert eight existing classrooms into four new instructional nursing labs and two new storage rooms. The construction included painted masonry walls, LVT flooring, acoustic tile ceilings, reconfiguration of existing HVAC systems, new plumbing systems, new electrical power, lighting and data wiring, a new IDF closet, modifications to the existing fire suppression system and fire alarm system, new window blinds, and new white boards. New furnishings and instructional technology were supplied and installed separately by RCSJ.